bok:app:apm:fn-arch [2021/06/22 02:48] anwlur created |
bok:app:apm:fn-arch [2021/06/22 03:17] anwlur [5.2.2 Programmed Station Stop] |
||
---|---|---|---|
Line 85: | Line 85: | ||
===== 5.2.2 Programmed Station Stop ===== | ===== 5.2.2 Programmed Station Stop ===== | ||
+ | |||
+ | * Programmed station stops shall be made with acceptable passenger comfort limits. | ||
+ | * Shall provide an opening of 82 cm opening for all doors. | ||
+ | |||
+ | ===== 5.2.3 Door and Dwell Time Control ===== | ||
+ | |||
+ | * Shall be possible to manually disable operation of any door set without affecting automated operation of other train sets. | ||
+ | * If train doors are disabled the matching station doors shall be disabled automatically | ||
+ | * If any door fails to close within 10 s of being commanded to close an alarm shall be sent to central control. | ||
+ | |||
+ | ====== 5.3 Automated Train Supervision ====== | ||
+ | |||
+ | ===== 5.3.1 Constrains on ATS ===== | ||
+ | |||
+ | * If ATS fails then ATP and ATO shall continue operations. | ||
+ | |||
+ | ===== 5.3.2 Status and Performance Monitoring ===== | ||
+ | |||
+ | * Station and information shall be presented to central control operator. | ||
+ | |||
+ | ===== 5.3.3 Performance Control and Override ===== | ||
+ | |||
+ |